Skip to main content

Stewart Signs Ltd
Trafalgar Close
Chandler’s Ford Industrial Estate
Eastleigh, Hampshire
United Kingdom
SO53 4BW

Registered in England No 782263

VAT No GB 188 7627 03

 
Email: sales@stewartsigns.co.uk

Tel: +44 (023) 8025 4781
Fax: +44 (023) 8168 0078

 

Refurbish, rebrand, revitalise!

Find out more

Merseyrail

What we did

Refurbish, rebrand, revitalise!

 

Client: Merseyrail

 

In 2014, one of the oldest rail fleets in the UK underwent a dramatic livery refresh. 59 Merseyrail trains received a complete new exterior livery wrap, as well as interior decor enhancements.

Train branding experts Stewart Signs Rail handled the entire refurbishment for Merseyrail, at their Birkenhead Depot, in a fully-managed, quick and easy, ‘one-stop’ programme, revitalising the entire
fleet of 3-car units, one per week.

Challenge:

  • Merseyrail wanted an easy one-stop service they could trust to handle the whole job, including dilapidations, surface treatment, paint and livery application, within a quick weekly turnaround. They needed to be sure the graphics would stay vibrant for the decade, and come with graffiti protection.

Project:

  • Firstly, our fully trained and supervised local Merseyside workforce removed the existing graphics we had installed in 2003; the team then prepared and smoothed the train surfaces by sanding, filling and
    painting the exteriors, prior to applying the new graphics.
  • As well as looking great, the train wraps – made with durable 3M VHR rail-approved materials – will help prevent body corrosion.
  • The 3M MCS graphic system means the graphics will last the course. For added protection, each panel is printed with our patented Signshine anti-graffiti coating helps keep the livery clean and fresh.

Solution:

  • Stewart Signs Rail completed the work in-depot at the rate of one train per 5-day week, avoiding service disruptions.
  • The finished livery is brand consistent across the fleet, is guaranteed to last, and has Signshine protection to keep it clean and fresh.
  • A cost-effective fleet refurbishment resulted in a stylish new look fleet, happy passengers and ultimately a happy client.
  • The new look full colour ‘wrap’ livery will last until at least 2020 when the fleet is replaced. It depicts Merseyside attractions, showing how workers, students and leisure passengers can enjoy and make
    the most of their journey.

Recent Projects

South Western Railway

Read more →

Virgin Trains East Coast

Read more →

Virgin Trains

Read more →

Merseyrail

Read more →

Do you have a Rail project we can help with?

"*" indicates required fields

Contact Stewart Signs
This field is for validation purposes and should be left unchanged.